Sunday, February 27, 2011

Photo classroom decoration articles 79 ... want to know what you should be

 1. upfront design - 2. Subject Chaigai - 3. Hydropower Reform - 4. woodworking - 5. tiling - 6. whitewash finish - 7. kitchen ceiling - 8. Cabinet Installation - 9. doors installed - 10. flooring installation - 11. tiling wallpaper - 12. Radiator Install - 13. switch socket - 14. Lighting Installation - 15. metal ware installation - - 16. curtain rod installation - 17. Pioneer cleaning - 18. Furniture approach - 19. Appliance Installation - 20. home accessories decoration, generally done in accordance with the 20 steps. Here, against the best of my death the largest can to understand me now the whole process of the renovation process and the many details that need attention to detail as much as possible again ... ... one, fitting the whole process of analysis is also part of the 20 construction, and the difference is that the bees bees build is a reflection of instinct, and people in the building before the mind to form ideas and framework first. So, if the home improvement likened to a battle, then the home improvement is the battle-front design of the , is the decoration of the The contents include: 1, clear the area involved in the renovation process. especially the tiling area, an area of wall paint, wallpaper area, floor area; 2, clearly the main wall dimensions. particularly since wall of furniture need to be designed size. I remember my foreman told me last accordance with the After the foreman turned and scolded bricklayer, said: , but the heart must be a number. take the opportunity to remind everyone, do not forget to start before the start procedures for the property, pay the renovation deposit. enter into the construction phase, the main Chaigai is the first on a project, including tearing down walls, walls, shovel plaster, the dissolution of Heating, for plastic-steel windows and so on. the main Chaigai bluntly, that is, first, first take up the framework of the site. before the water circuit transformation, the main structure should be basically completed Cagai. Chaigai in which the main water reform and between the two areas, some students may know, the cabinet should also be the first measurement. In fact, the first measurement of the so-called cabinet and no real content, because the walls and floor are not dealt with, cabinet designer can not give a specific design dimensions, but only reserved for developers on the outlet, hood outlet location, several suggestions. include: 1, to see whether the location outlet hood after the hood of the installation; 2, see the suitability of the location of water meters; 3, to see whether the location on the outlet of the tank to facilitate later installation. For the first measurement of the cabinet, slightly experienced students can complete on their own. waterway renovation is complete, followed by the toilet water is best do. kitchen generally do not need to do water. Some students have always thought that before the start of renovation, some ingredients should be pre-admitted. I would say that, unless it is the main ingredient used Cagai need, otherwise, such as ceramic tile, large core board ingredient of the approach time should be after the water reform. because the circuit transformation involving the ground, then slotted, ceramic tile, laying position Daixinban properly, workers moved around very troublesome. two days before the order: Wood - W - oil. the basic principle is played - who should Shang who is dirty. In fact, the riser as the package, do decorative ceiling, attached to plaster line like carpentry sense can be used as a small part of the main Chaigai consider the circuit itself and the water does not conflict transformation, and sometimes also need some with, such as mentioned in my last posts - too busy to open the case, the general foreman in the second child, After doing the window cover, workers will prepare to install marble glass, plastic, marble and easily put the plastic window cover glass sealed. 2, floor drain installation. floor drain is the decoration appears as the first hardware, because it wants to together with the installation of floor tiles. Therefore, the students begin visiting the building, it should catch the early children to buy land drain. 3, range hood installation. hood is the first appearance of the home appliances, kitchen tiles laid, you can consider installing smoke machine was. youngest significance is not great, because the painting behind the operation of no more than a dirty again. I write to you, death breath against the children, chatting with you two. When the ; Old Three decoration decoration only is a continuation of the family At the same time installed, or leave the head and outlet openings. take the opportunity to plug one, I insisted, how to how to rule, how to do solid wooden doors, wallpaper paste how to how professional, how to create useful cabinet ... ... In my opinion, renovation team can do is carpentry, tiling, painting because I believe professional construction, installation standards that manufacturers believe that the product pipeline operations, mostly manual workers than the slightly better team decoration. decoration like game, gambling is the worker's skills, so bet on Construction of Genius convergence side his home decoration, every aspect of your dedicated workers are the owners do. home decoration to something so, in itself really nothing to speak of convergence, but rather the students themselves play in the home improvement process should be as much as possible the so-called effect , lighting, hardware and other aspects of the installation who is responsible for the problem depends on the one hand, and workers get along with you to see the final there is no one willing to Some links for cabinet door installed. Hopefully, one day to complete. be installed along with the sink (may not include the upper and lower parts of water) and gas stove, cabinets before installing the best coordination of the gas through the property, because after a gas stove installed need to test gas. Yes, just said that ceiling, there is a problem worthy of study, many students choose waterproof gypsum board ceiling kitchen with waterproof paint, decoration team generally offer more than 120 yuan per square meter, than the average Lvkou Ban, PVC wall panel ceiling to be expensive. gypsum board ceiling looks visually smooth, but after the top of the water if there are problems, or upstairs, downstairs, with the need to repair leaks, gypsum board ceiling is necessary to dismantle the whole, compared to gusset ceiling much trouble. Therefore, we select the gypsum board ceiling in the time needed to be careful. installed in the cabinet the next day, early in the month before the doors of measurement is complete, now about the installation. well, then, is one day, put the door hinge to be installed at the same time, door locks, to suck. students should be prepared in advance the relevant hardware. If you want to install window cover door manufacturers, Pass, then manufacturers of wooden doors, measure the time should be measured, and the doors installed same day to install, taking into account the installation of the marble windowsill back the wrong time, after row of the window cover installation. Note: wooden doors of the production cycle is generally one month, so, in order to Let the duration of convergence close to the main doors as early as possible after the completion Chaigai door manufacturers to measure the size of openings. On the doorway of the deal, we need to note that the height of inconsistency if the house doorway, into a high need for workers to deal with - good-looking . the doors can be installed the next day to install the floor, and goes well, is one day. floor installation requires attention to the following questions: 1, floor installation, the best site survey to manufacturers about the need for leveling the ground or in part, leveling, and some decoration or renovation of the company team will advise students leveling leveling the ground or in part, to the actual survey of manufacturers subject to the floor; 2, flooring installation, home of the pavement surface to be cleaned the floor, to ensure that the dry ground, So do not water cleaning process. 3, floor installation, able to do so, the floor of the cutting must be in the hallway. before the Forum also discussed this issue, some students think that cutting the floor in the corridor pollution in public areas and immoral. my thoughts After the sweep is completed, it does not matter. in the cutting room floor on the wall of the pollution is serious, there is a similar artificial stone cabinet cutting table, I believe the number of students have renovated experience. on the floor the second day of installation , clean up the house to be about wallpaper Stones, and goes well, the same day. able to do so, paving the day wallpaper, floor protection should do something; no conditions does not matter, left the floor to clean up Pioneer cleaning wallpaper glue to have no problem. tiling wallpaper before the walls to try to make sense of the radiator can be linked to the wall. same day. doors - floor - Wallpaper - radiator, which is a generally accepted correct installation sequence, first loading door is to ensure the floor of the baseboard and doors of the door pocket can close bonding; wallpaper installed after the installation was mainly due to the dirty floor, dust and more serious pollution of the wallpaper. here again in front of me used to say, on Courts need to install the floor after the door installation doors, but such exceptions are rare in the renovation process. In addition, in front of me repeatedly that For the decoration, it is not long, so even if no installation conflicts, such as cabinets and doors, the students also try not to time of day while the two appointments to install, particularly those mentioned above, the pieces c) anti-death switch socket with only a reminder: students should switch between home and the natural outlet of each number, location and other issues have a detailed understanding of, or records, especially for students wallpaper, wallpaper workers sometimes live responsibility, once covered with wallpaper to the hula, he would not have wallpaper knife in your opening marked the location of switches and sockets. Therefore, the students still need their hearts. mounted lights, nothing to say. Bahrain lights, home to bright , bid farewell to the renovation of 100-watt incandescent bulbs during the glare - it was fine. (fifth) metal ware pipe before installing the upper and lower parts bought, bathroom accessories, toilet, drying racks, etc., are fitted together to . in front of those no exaggeration to say that you first open the water watched the dragon, It played back a good name - everyone. pioneering cleaning, the family not to have furniture and appliances are not required to keep more of the transformation in the water after the completion of the circuit, so select the basic size range of furniture was generally a number of our hearts. Therefore, some students before the start of the renovation has not been eager to set the furniture, personal feel no need to. to this time, The approach of the appliance approach, the installation of the installation, ready to check out! home accessories, home improvement the last step, and has been decorated by the fitting into, including the installation of the curtains are all aspects of home accessories. As for buying curtains It is best to set after the furniture in order to avoid style conflicts. home accessories also can consider buying some green plants, wall paintings, decorative arts and crafts and so much more ... ... In short, stay, you can freely play. II , the renovation process by reading the first section of the two students may feel a little chaotic, in order to facilitate a better understanding of all the 20 steps and the need to pay attention during the entrainment of some of the links, dead in front of it against the 20 basis, but also added into the 10 the first measurement - 7 Hydropower Reform - 8 toilet water - 9 ingredient approach - 10 Woodworking - 11 tiling (installed bay windows, floor drain) - 12 to install smoke machine - 13 second measurement cabinet - -14 whitewash finish - 15 kitchen ceiling - 16 Pass Gas - 17 cabinet installation (to install the sink, gas stove) - 18 doors installed - 19 Floor Installation - 20 Stones Wallpaper - 21 Radiator Install - 22 switch socket - 23 lighting installation - 24 metal ware installed - 25 installed curtain rod - 26 Pioneer cleaning - 27 Furniture approach - 28 Appliance Installation - 29 home accessories - 30 move (a) four-step the whole process of renovation by broad-brush, said, according to the text in the beginning part of the 20 mentioned by the decoration of the whole process can be divided into the following four aspects: 1, design aspects; (1) 2, the construction areas; (2-6) 3, the installation part; (7-16) 4, ending link. (17-20) (b) fitting the whole process of division in accordance with the engineering characteristics of the six steps, according to the 30 just mentioned a part of division, the decoration of the whole process can be divided into the following six steps: Step one: design ideas; (3) the second step: the main Chaigai; (4) The third step: hidden engineering; (7) The fourth step: cover the project; (10,11,14,15,19,20) Fifth step: the installation phase; (17,18,21,22,23,24,25) Step Six: the ending phase. (26,27, 28,29,30) 1, in order to distinguish it from the bees, we must first have design ideas; 2, the main Chaigai is to complete the blank room into the site. Chaigai including the main contents of the above has just said - tearing down walls, masonry, plaster shovels, demolition Heating, for plastic-steel windows, etc. often say - wood, tile, oil is the basis of these three projects, the back wall panel ceiling, deck flooring, wallpaper over, even if worn over clothes; 5, the installation stage, and completion of implementation. including: cabinets, wooden doors, radiators, switches, sockets, lighting installation, hardware, sanitary ware, curtain rods ... ... Each item has its own set of functions; 6, the final phase, plainly, is to not constitute ; the full complement of factors. by Section II, understanding.

No comments:

Post a Comment